First Call for Concrete work
Fleming Complete demolished Comtech’s existing slab while pouring a new 18 inch thick pad in order to house a 3,000 gallon liquid nitrogen tank at Comtech’s Satellite Devices plant.
Fleming Complete had to coordinate all phases to ensure the safe install. The success of the project hinged on a pad which ultimately could withstand the large vessel.
Material engineers performed the required break test to ensure a 4,000 psi rating on the concrete as the Fleming team worked to enclose the tank with a 8 foot tall blocks wall with rebar, secured with wrought iron fence and gates.
Project details
| Completion Date | January 2008 |
| Project Type | Industrial |
| Owner/Reference | Comtech E.F. Data 2114 West 7th Street Tempe, AZ |
| Architect | N/A |