First Call for Concrete work

Fleming Complete demolished Comtech’s existing slab while pouring a new 18 inch thick pad in order to house a 3,000 gallon liquid nitrogen tank at Comtech’s Satellite Devices plant.

Fleming Complete had to coordinate all phases to ensure the safe install. The success of the project hinged on a pad which ultimately could withstand the large vessel.

Material engineers performed the required break test to ensure a 4,000 psi rating on the concrete as the Fleming team worked to enclose the tank with a 8 foot tall blocks wall with rebar, secured with wrought iron fence and gates.

Project details

Completion Date January 2008
Project Type Industrial
Owner/Reference Comtech E.F. Data
2114 West 7th Street
Tempe, AZ
Architect N/A

Fleming CompleteROC235750dot133 E. Comstock Dr.Chandler, AZ 85225